 HE Vinodol
Sušik 15,
51243 Tribalj
tel. ++ 385 51 78 02 22,
fax: ++ 385 51 78 02 01 |
 |
 |
 |
The Vinodol hydro power system uses the waters of the basins of Lokvarka (including Križ brook) and Ličanka (Bajer, Lepenica and Potkoš reservoirs) and a few other smaller streams. While this catchment area is not large (about 80 km2), the energy value of this system is confirmed by the fact that the catchment area is located at a height above 700 m and that the gross head of the Vinodol power plant is 658 m, which is one of the highest heads of hydroelectric facilities achieved in Europe. The construction of the facilities began in 1939 and the system has been in operation since 1952. With the aim to increase production, the system was expanded in 1985 to include the pump storage power plant Lepenica.
The main parts of the Vinodol power plant are Lokvarka dam and reservoir, Fužine pump storage power plant and Bajer reservoir, Lepenica dam and reservoir, Lepenica pump storage plant, Križ pumping station, Lič pumping station, Lokvarka-Ličanka tunnel, Križ connecting tunnel, Lič pipeline, Kobljak-Razromir tunnel, penstock and powerhouse of Vinodol power plant.
Note: The system of the Vinodol hydro power plant organizationally includes the Zeleni Vir hydro power plant although it is not within the same hydraulic system.
| Power plant |
Type |
| Vinodol 90 MW |
Storage |
| Fužine 4,6 MW |
Pump storage |
| Lepenica 1,14 MW |
Pump storage |
| Zeleni Vir 1,7 MW |
Run-of-river |
| Annual production |
Average |
2009 |
2010 |
2011 |
| HE Vinodol |
139 GWh |
123,8 GWh |
190,4 GWh |
97,890 GWh |
| CHE Fužine |
4,7 GWh |
2,4 GWh |
5,9 GWh |
3,227 GWh |
| RHE Lepenica |
0,45 GWh |
0,1 GWh |
0,7 GWh |
0,239 GWh |
| HE Zeleni Vir |
7,7 GWh |
5,8 GWh |
8,4 GWh |
5,2 GWh |
| Total HES Vinodol: |
151,85 GWh |
128,78 GWh |
205,5GWh |
106,562 GWh |
| Vinodol - Units |
Type |
Year of
construction |
| A 30 MW |
PELTON |
1952/2003 |
| B 30 MW |
PELTON |
1953/2003 |
| C 30 MW |
PELTON |
1953/2002 |
Vinodol hydro power plant
General data:
- location: area of Primorje-Gorski Kotar County, Tribalj
- type: high-pressure reservoir diversion type
- in-service year: 1952
Energy data:
- installed flow: Qi = 18.6 m3/s (3 x 2 x 3.1)
- net head: H = 658.50 m
- mean net head: H = 623 m
- installed capacity:94.5 MW (3 generating sets x 2 turbines x 15.75 MW)
- maximum annual production: ('76-'06) Emax = 197 GWh
Fužine pump-storage power plant
General data:
- location: area of Promorje-Gorski Kotar County, near Fužine
- type: pump-storage
- in-service year: 1957
Energy data:
- installed flow: Qi = 10 m3/s in turbine mode, 9 m3/s in pumping mode
- net head: H = 37 m
- installed capacity: 4.6 MW (turbine mode)
- motor power: 4.8 (in pumping mode)
Lepenica pump-storage power plant
General data:
- location: area of Primorje-Gorski Kotar County, near Fužine
- type: reversible pump turbine
- in-service year: 1985
Energy data:
- installed flow:Qi = 6.2 m3/s in turbine mode, 5.3 m3/s in pumping mode
- nominal head: H = 17.95 (turbine)
- nominal head: H = 15.00 (pump)
- installed capacity: 1.14 MW (turbine mode)
- pump installed capacity: 1.25 MW
Zeleni Vir hydro power plant
General data:
- location: on the Curak stream, near Skrad
- type: diversion, run-of-river
- in-service year: 1921
Energy data:
- installed flow: Qi = 4.2 m3/s (2 x 2.1)
- net head: H = 50 m
- installed capacity: 1.7 MW (0.9 + 0.8)
- mean annual production: Esr = 7.7 GWh
- maximum annual production achieved: ('1976-2006) Emax = 9.4 GWh ('84)
|
|