 HE Zakučac
(Zakučac Hydro Power Plant)
21310 Omiš
tel: ++ 385 21 73 70 29,
fax: ++ 385 21 73 70 48 |
 |
The Zakučac hydro power plant was constructed in the lower flow of the Cetina River, near Omiš. Zakučac is the largest plant in the Cetina River basin and the largest hydro power plant in Croatia by its installed capacity and potential power production.
Director: Igor Šodan
General data:
- location: area of Split-Dalmatia County, municipality of Omiš, on the Cetina River near Omiš
- type: diversion
- in-service year:
- Zakučac I -1962
- Zakučac II -1981
- total capacity: 486 MW
Energy data:
- installed flow: Qi = 220 m3/s (2x50 + 2x60)
- design head: Ht = 250.4 m
- turbine installed flow: 486 MW (2x108 + 2x135)
- maximum annual production: (1980-2008) Emax = 2056 GWh (1980)
- mean energy equivalent: 0.6 m3/kWh
| annual production |
average |
2009 |
2010 |
2011 |
| electricity |
1.448 GWh |
1.742,3 GWh |
2,430 GWh |
1.119 GWh |
| Unit |
turbine |
year of construction |
A 108 MW |
Francis |
1961 |
B 108 MW |
Francis |
1962 |
C 135 MW |
Francis |
1979 |
D 135 MW |
Francis |
1980 |
|