HomeHrvatskiSite MapContacts
HEP-Proizvodnja d.o.o.
   
 
 

HE na Krki


(Krka River Hydro Power Plants)
22303 Oklaj
tel: ++ 385 22 34 10 00,
fax: ++ 385 22 34 10 17
Certifikat

Director: Stanko Sapunar

Golubić Golubić hydro power plant
General data:

  • location: area of Šibenik-Knin County on the Butišnica River
  • type: diversion
  • in-service year: 1981

Energy data:

  • installed flow: Qi = 14m3/s (2x7)
  • design head: Ht = 59 m
  • turbine installed capacity: 6.84 MW (2x3.75)
  • maximum annual production: ('81-'97)Emax = 29 GWh ('96)

Miljacka Miljacka hydro power plant
General data:

  • location: area of Šibenik-Knin County on the Krka River, 15 km downstream of Knin
  • type: diversion
  • in-service year: 1906

Energy data:

  • installed flow: Qi = 30m3/s (3x8 + 1x6)
  • design head: Ht = 102 m
  • turbine installed capacity: 24 MW (3x6.4 + 1x4.8)
  • maximum annual production: ('81-'97) Emax = 147 GWh ('74)

Jaruga hydro power plant
General data:

  • location: area of Šibenik-Knin County on the Krka River, near Skradinski Buk
  • type: diversion
  • in-service year: 1903

Energy data:

  • installed flow: Qi = 31 m3/s (2x15.5)
  • design head: Ht = 24.4 m
  • turbine installed capacity: 5.8 MW (2x3,6)
  • maximum annual production: '('81-'97) Emax = 41 GWh ('74)
annual production 2009 2010 2011 2012 2013
Golubić 20,4 GWh 29 GWh 13 GWh 12 GWh 25,3 GWh
Krčić 0,8 GWh 1 GWh 1 Gwh 1 Gwh 1,4 GWh
Miljacka 102,4 GWh 122 GWh 63 GWh 51 GWh 85,6 GWh
Jaruga 34,3 GWh 33 GWh 17 GWh 24 GWh 35,8 GWh


Golubić
capacity type year of construction
Unit A 3,3 Mw Francis 1981
Unit B 3,3 MW Francis 1981
Krčić
Unit A 0,35 Mw Francis 1988
Miljacka
Unit A 6,4 MW Francis 1956
Unit B 4,8 MW Francis 1906
Unit C 6,4 MW Francis 1956
Unit D 6,4 MW Francis 1956
Jaruga
Unit A 3.6 MW Francis 1936
Unit B 3.6 MW Francis 1936
 
www.hep.hr HEP Group Pravne napomene/legal noticies Legal notices