   HEP d.d.
   
 
 

Plomin TPP Reconstruction

The purpose of the project is to build a long-term, safe and stable source of electricity. The replacement unit will have a capacity of 500 MW at the generator, instead of the existing 125 MW at the generator. After the reconstruction, the existing capacity at site in the order of 335 MW will be increased to 710 MW. The start-up of the replacement unit is planned after the shutdown of unit TPPP 1.